Shift Summary for 8/3/00 16:00-24:00 On Shift: SP,MN Log Book #8 Pages 244-246 A problem with the booster to main injector transfer line allowed us to keep running till midnight by which time we had almost 1.5 pb-1 for this point. Run Summary: Chi0 (3392MeV) Run Luminosity 7066 236.5 nb^-1 7067 256.0 nb^-1 7068 274.5 nb^-1 (tape full stopped run) Total integ. luminosity collected in stack 42: 1.43 pb^-1 Smooth shift except for a problem turning gas-jet off at end. No comments. Good night. Stephen and Matteo