On shift: DJ, PZ CHI1 Scan (2nd Energy Point: E=3510.6 MeV) Logbook 8, Pgs. 258-260 Run 7082 (inherited) Initial Current: 29.7 mA Final Current: 26.6 mA Integrated Lum: 323.8 nb-1 Run 7083 Initial Current: 26.6 mA Final Current: 25.8 mA Integrated Lum: 93.8 nb-1 Run 7085 Initial Current: 25.8 mA Comments: 2 DAQ hangs, 1 Straws trip 16:10 Run 7080 ended and beam energy was changed from 3511.6 MeV to 3510.6 MeV. 17:50 Run 7082 began at beam energy of 3510.6 MeV 21:37 Run 7083 began at beam energy of 3510.6 MeV 22:39 Run 7083 stopped and beam energy was changed from 3510.6 MeV to 3511.1 MeV. 22:47 Run 7085 began to take data while the beam energy was changed. Good night, Pete and Dave