Shift Summary for 8/13/00 0:00-8:00 On Shift: JK,DC Log Book #8 Pages 274-277 Beginning Current : 30.9 mA Final Current : 18.9 mA Typical Luminosity: 3.4 x 10^31 cm^-2 s^-1 Typical Beam Width: 0.96 MeV/c D state search point 1 (3810 MeV) Run Luminosity 7103 363.1 nb^-1 Total Luminosity for point 1: 486.5 nb^-1 Deceleration to the second point (3800 MeV) started at 0:20 with 30.7 mA and ended at 1:25 with 25.1 mA. There was a sudden 5 mA loss at 0:36. 7104 pedestal run 7105 514.7 nb^-1 7106 0.0 nb^-1 (see below) 7107 given to day shift Comments: A few DAQ hangs, one ACNET alarm, and one jet nozzle unclog. At 5:58 the minbias file (file 6) became too large and so run 7105 stopped before the 95% tape full requirement. Since there were no tapes mounted, run 7106 aborted itself. Tapes were mounted and run 7107 began at 6:10. Deceleration to the next point will take place on the day shift around 10:00.