Shift Summary for 8/17/00 16:00-24:00 On Shift: AT,ZM Log Book #8 Pages 286-287 Begining Current : 20.6 mA Final Current : 14.1 mA Search at 3770 MeV Run Luminosity 7116 515.8 nb^-1 (inherited) 7117 in progress Typical Sigma_p= 1.3 Mev/c Typical Luminosity: (3.0-3.5)x10^31cm^-2sec^-1 Comments: 1 daq hang and 3 nozzle uncloggings. the total integrated luminosity for this stack so far 465+476+516+487 = 1944 nb-1 Good night, Amiran and Zaza