Shift Summary for 8/18/00 0:00-8:005 (actually 3:30) On Shift: DC,MO Log Book #8 Pages 287-289 Begining Current : 14.1 mA Final Current : 12.3 mA Nominal energy : 3770 MeV Run Luminosity 7117 522.7 nb^-1 (inherited) 7118 200.6 nb^-1 Typical Sigma_p= 1.3 Mev/c Typical Luminosity: (2.4-1.7)x10^31cm^-2sec^-1 Comments: -Run 7117 --> we noted that the number of events written on GN8117 is less than 1/2 of events written on GN7117. - Run 7118 --> no problem about number of events written on GN tapes -->1 daq hang -->1 nozzle uncloggings. --> stopped at 2:50 am The total integrated luminosity for this stack: 466.5+477.5+517.5+522.7+200.6 = 2184.8 nb-1 (worked out with Lum_read_ddbar) End of stack script runned Have a nice day, David C. and Margherita