On shift: WR & WB Log Book #9 Pages 25 Energy: Psi' peak Beam Current at the beginning of the shift: 17.34mA, 15.65mA at the end Data taking summary: run# Integrated-lum 7250 ~400 nb^-1 (scaling the luminosity of the last psi' run for the the number of events on tapes) 7251 under way What happened: 17:20 Some problems with the motorized plates(?) that cause a drift in the energy. Steve Werkema asked to turn off the jet to bring it back to the right value. 19:15 Jet on Nothing else happened, apart from the instability of the jet that kept us awake Have a good night Willi & Wander