Owl Shift Summary for 10/15/2000 On Shift: PZ, DJ Logbook #9 Pgs.27-30 Run 7253: Pedestal Run 7254: Energy = 3686 Mev Initial Beam = 33.5 mA Integ. Lum (end of shift) = 216.5 nb-1 Comments: *Decceleration begun at beginning of shift. *Pedestal run 7253 taken at 2:10 *Run 7254 begun at 5:30 *Cable for channel 13 in H2' was found to be pulled out of patchpanel. Reconnected at end of shift. *1 Gas Jet Unclogging *2 DAQ hangs, reset successfully. Bye-bye, Pete and Dave