Keith Gollwitzer UCI E835 Statistics for Accumulator usage 1997-Mar-10 00:00 (Mon) Start 45.0mA Stacking 1997-Mar-17 23:59 (Sun) Stop 34.4mA Data taking Stacking 25.0mA [10.25hr] (M) 30.1mA [ 9.50hr] (F) 62.8mA [19.75hr] (F/S) ================== 117.9mA [39.50hr] Total BEAM USAGE Deceleration Above Transition -11.5mA [ 2.75hr] (M) -0.1mA [ 0.75hr] (M) -0.9mA [ 1.25hr] (T) -0.1mA [ 1.00hr] (T) -0.2mA [ 2.00hr] (T) -0.8mA [ 1.75hr] (W) -0.1mA [ 1.50hr] (Th) -0.1mA [ 0.75hr] (Th) -5.0mA [ 3.25hr] (S) (Acceleration) -0.1mA [ 0.75hr] (S) -0.1mA [ 1.25hr] (Su) ================== -19.0mA [17.00hr] Total Data Taking Above Transition -3.7mA [ 5.75hr] (M) {0.39 pb^-1} -3.8mA [ 6.50hr] (M/T) {0.40 pb^-1} -3.9mA [ 6.25hr] (T) {0.42 pb^-1} -3.7mA [ 6.25hr] (T) {0.42 pb^-1} -4.6mA [ 9.50hr] (T/W) {0.50 pb^-1} -17.3mA [29.00hr] (W/Th) {1.89 pb^-1} -1.8mA [ 5.75hr] (Th) {0.22 pb^-1} -2.2mA [ 6.00hr] (Th/F) {0.24 pb^-1} -19.0mA [28.75hr] (S/Su) {2.00 pb^-1} -2.0mA [ 2.75hr] (Su) {0.06 pb^-1} ================== -62.0mA [106.50hr] Total {6.54 pb^-1} Beam Dumped (Intentionally) -13.9mA (F) Beam Lost (Machine Failure) -30.1mA (F) Other: E835 Detector Studies -1.2mA [ 2.00hr] (M) Target OFF; energy drift -0.1mA [ 0.75hr] (W) E835 Detector Studies -2.2mA [ 2.25hr] (S) {Note: detector studies integrated luminosity used ~0.4 pb^-1}