Keith Gollwitzer UCI E835 Statistics for Accumulator usage 1997-Apr-28 00:00 (Mon) Start 15.1mA Data Taking 1997-May-04 23:59 (Sun) Stop 8.1mA Stacking Stacking 35.6mA [14.50hr] (M/T) 25.6mA [10.75hr] (W) 27.3mA [11.50hr] (Th/F) 25.5mA [ 9.50hr] (F) 25.7mA [ 9.25hr] (Su) 15.8mA [ 5.00hr] (Su) 8.1mA [ 2.25hr] (Su) ================== 163.6mA [62.75hr] Total BEAM USAGE Deceleration Below/Thru Transition -20.4mA [ 3.75hr] (T) -12.7mA [ 6.50hr] (W/Th) -7.0mA [ 2.50hr] (F/S) -11.4mA [ 2.50hr] (Su) -7.8mA [ 2.25hr] (Su) 1MeV deceleration ================== -59.3mA [17.50hr] Total Data Taking Below Transition -7.7mA [17.25hr] (M) {0.48 pb^-1} -9.5mA [17.50hr] (T/W) {0.38 pb^-1} -7.9mA [13.00hr] (Th) {0.35 pb^-1} -11.8mA [22.00hr] (S) {0.50 pb^-1} ================== -36.9mA [69.75hr] Total {1.71 pb^-1} Beam Dumped (Intentionally) -6.9mA (M) -6.1mA (Su) -6.5mA (Su) -15.8mA (Su) "Water Leak" Beam Lost (Deceleration Failure) -27.3mA [ 3.00hr] (F) Other: Detector Studies -0.5mA [ 2.75hr] (M) {0.03 pb^-1} Accelerator Studies -5.7mA [ 5.25hr] (W) "Beam Dump" Accelerator Studies -5.0mA [ 3.50hr] (Th) "Beam Dump" Detector Studies -0.6mA [ 1.75hr] (S/Su) {0.02 pb^-1} Access (water leak) [ 1.75hr] (Su)